Jump to content

Line M101 (Beijing Subway)

From Wikipedia, the free encyclopedia
Line M101
Construction site of Beijing Dajuyuan station
Overview
StatusUnder construction
LocaleTongzhou district
Beijing
Termini
Stations14[1]
Service
TypeRapid Transit
SystemBeijing Subway
Operator(s)Beijing MTR Corp. Ltd.[2]
Depot(s)Fuhaocun[3]
Rolling stock3 car Type A, reservations for 3+3 car Type A in the future[4]
History
Planned opening2027; 3 years' time (2027) (planned)
Technical
Line length18.1 km (11.2 mi)[1]
CharacterUnderground[1]
Operating speed100 km/h (62 mph)[4]

Line M101 of the Beijing Subway (Chinese: 北京地铁M101线; pinyin: Běijīng Dìtiě M101 Xiàn) is a rapid transit line under construction in Tongzhou District, Beijing, China.[4] It will run from Shangwuyuan to Zhangjiawandong. It is fully underground.[1] It is scheduled to open in 2027.[5][6] The line will be 18.1 kilometres (11.2 mi) in length with 14 stations.[5][3]

Stations

[edit]
Station name Connections[5]
English Chinese
Shangwuyuan 商务园
Tongzhou West Railway Station 通州西站  M102  (under planning)
Tongshun Lu 通顺路
Tongzhou Huiyi Zhongxin 通州会议中心
Longwangzhuang 龙旺庄
Tonghu Dajie 通胡大街  M103  (under planning)
Yudaihe Dajie 玉带河大街
Beijing Sub-Center Railway Station 城市副中心站  Pinggu  (U/C)
 6  (via Beiyunhedong)
Xingzheng Bangong Xiqu 行政办公西区
Beijing Dajuyuan 北京大剧院  M104  (under planning)
Tiyu Zhongxin 体育中心
Zhangjiawanxi 张家湾西
Zhangjiawan 张家湾  M102  (under planning)  M104  (under planning)
Zhangjiawandong 张家湾东

References

[edit]
  1. ^ a b c d "北京又一地铁新线开工!设14座车站,有6座换乘站". 2024-12-10.
  2. ^ "中交集团副总经理王建出席并讲话!中交路建与京港地铁签署项目合作意向书". 见道网. 2022-01-22. Archived from the original on 2022-05-15. Retrieved 2022-01-22.
  3. ^ a b "2023年京投公司重大投资项目情况". 2023-02-23. Archived from the original on 2023-02-25.
  4. ^ a b c "北京轨道交通M101线一期工程进入全面建设阶段". 2024-12-10.
  5. ^ a b c "北京轨道交通M101线一期工程环境影响报告书(2023年5月).pdf" (PDF). 2023-05-26. Archived from the original (PDF) on 2023-05-29. Retrieved 2023-05-29.
  6. ^ "北京城市副中心M101线最新线路图公布 计划2027年年底通车". 2022-04-20.